Quality management
Internal auditor in quality management iso 9001: 2015 - iso 19011
Implementation
Industry
Theme
• introduction.
• audit principles. process maps.
• documentary structure aligned to the requirements. quality manual. procedure. work instructions. quality records.
• structure iso9001: 2015. elements of the standard, application examples.
• development of each element of the standard with examples.
• implementation to iso9001: 2015. key aspects of the management system.
• revision of the iso19011 standard.
• audit process
• examples of application in each element considered.
• application exercises associated with the points considered.
Hours
16hs
Io 9001: 2015 update workshop
Implementation
Industry
Theme
Introduction / definitions /
• structural and content changes
• relationship to other management system standards
• differences in terminology
• process approach
• risk-based thinking
Implementation of new requirements
• applicability of the rule
• knowledge of the organization
• correlation between the requirements of the 2015 and 2008 versions
• process of transition of certifications iso 9001: 2008 to iso 9001: 2015
Examples of implementation.
Exercises.
Final evaluation
Hours
16hs
iso9001: 2015 (quality management system)
Implementation
Industry
Theme
Introduction / definitions / basic concepts of the standard ponts / differences with the 2008 version / important aspects / phases of the implementation of the standard in plant /
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
Risk management workshop and implementation guidelines in iso 9001: 2015
Implementation
Risk approach. this approach is compatible with other recognised management systems, and should apply to all types of organisation, regardless of their size or sector (industrial and service).
Theme
1. risk management.
2. influence of the internal and external context of the organization.
3. inclusion of risk management in iso 9001: 2015.
4. guidelines and standards (iso, iso / iec, iram, as / nzs) concerning risk management.
5. risk management stages: methods, tools, documentation.
a. risk assessment:
• identification.
• risk analysis.
• risk assessment.
• risk treatment.
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
Non-conformities management workshop
Implementation
Types of non-conformities following specific guidelines, considering in certain cases the opening of corrective actions and implementation of and prevention tools, to prevent the repetition of problems and / or prevent them from occurring
Theme
Introduction / definitions / • general: definitions and concepts.
• sources of non-conformity.
• steps to define corrective action.
• a clear description of the problem.
• practical implementation activities.
• implement containment actions.
• definition of root cause.
• methodologies: fish thorn and 5 pigs.
• practical implementation activities.
• selection of corrective action.
• monitoring and closing.
• preventive action.
• practical implementation activities.
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
Plan de control
Implementation
Product control
Theme
Theoretical concepts / definitions / control plan prototypes / pre-launch control plan / production control plan / characteristics / verification of current plans / suggestions to improve your current control plans /
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
Business sheet
Implementation
Product control in different operations
Theme
Theoretical concepts / definitions / realization of an example operation sheet / product critical characteristics / use of tools / verification of current operations sheets owned by the company / suggestions for improvements of the operations sheets held by the company /
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
Process flow diagram
Implementation
Control and improvement of the production process
Theme
Theoretical concepts / definitions / realization of a correct flow chart / important characteristics of process flow / verification of company process flows / suggestions for improvements of current company flows /
Examples of implementation.
Exercises.
Final evaluation
Hours
6hs
CEP (STATISTICAL PROCESS CONTROL)
Implementation
Continuous improvement and failure prevention
Theme
• introduction. theoretical aspects of statistical process control.
• iatf16949 requirements.
• control characteristics. use of control letters. process variation.
• statistical tools.
• explanation and examples of letters of control by attribute (p / / u / c / / np)
• explanation and examples of control letters per variable (the four cards and their typologies)
• daily and their use and importance.
• interpretation of the signs of instability and to be done as recommended actions. detection of failure.
• application formulas and their explanation
• examples of implementation. by attribute and by variable. final evaluation
Hours
6hs
Sampling principle
Implementation
Attention to customer requirements and control strategies
Theme
• introduction
• Areas of application. Objectives and benefits of applying a correct analysis of non-compliance
• sampling process. sample design.
• probabilistic sampling.
• muestreo aleatorio.
• sample distributions
• types of sampling
• iram standard15
• examples of implementation
Hours
6hs
AMFE (FAULT ANALYSIS AND ITS EFFECTS)
Implementation
Attention to customer requirements. continuous improvement and failure prevention
Theme
• introduction of the tool.
• stages for the creation of the fmea.
• types of fmea (the 5 types of fmea are mentioned), product characteristics and document cycle
• brief explanation of d-fmea (design fmea).
• explanation of the tables, 4 ° edition. detailed explanation of p-phema (process fmea)
• examples of implementation.
• exercise
Hours
8hs
QFD (DEPLOYMENT OF QUALITY FUNCTIONS)
Implementation
Customer requirements, continuous improvement, improvement analysis
Theme
• introduction
• Areas of application. purposes and achievement. Qfd objectives
• use of qfd in the voice of customers
• qfd in product development and process.
• use of the "quality house," for the product and the process.
• errors to avoid.
• examples of implementation.
• implementation exercises
Hours
6hs
8d (8 disciplinas)
Implementation
Customer requirements attention, fault analysis
Theme
Introduction. cause analysis tools, 8d elements, practical exercise.
Hours
8hs
PDCA (PLAN DO CHECK ACT)
Implementation
Customer requirements attention, fault analysis
Theme
Introduction. cause analysis tools, pdca elements, practical exercise.
Hours
8hs
VDA 6.3 (PROCESS AUDIT)
Implementation
Customer requirements, process capacity analysis
Theme
Introduction. customer requirements, vda 6.3 elements, practical exercise.
Hours
16hs